ナビゲーションメニューを開く

Allen Independent School District

Preparing for Microsoft Lync with a Network Voice Readiness Assessment

Background

The Allen Independent School District (www.allenisd.org) serves the rapidly growing city of Allen, Texas, a suburban community located 23 miles north of Dallas. Student enrollment has more than doubled since 1989, bringing the current number of students to more than 19,000 in grades K-12. Students attend one of 16 elementary schools, three middle schools, one freshman center and one high school.

With over 11,800 student and teacher workstations, close to 1,000 computers in administrative offices, and over 2,000 tablets, the Allen Independent School District maintains a major investment in their network infrastructure and computing technology. Providing connectivity to the district’s workstations is a sophisticated fiber and Ethernet network, connecting each of the 21 school facilities and both a primary and back-up datacenter facility. Connectivity to the Internet is accomplished using advanced network filtering and anti-virus systems located in district’s data centers, ensuring the students have a safe and productive educational experience.

In 2011, the school district recognized that their aging legacy TDM key systems and Centrex service was too expensive and inflexible for the needs of the expansive district going forward. As a result, the district had made a decision to move to voice-enabled Microsoft™ Lync™ Unified Communications for both administrative and classroom use, facilitating significantly greater flexibility, an improved educational experience and reducing the cost of operations over the TDM equipment.

Before beginning the Lync migration, a key milestone was identified to verify the performance of the district-wide network and its ability to reliably support real-time voice and video without disrupting other network applications. "It was important for the district to have a clear understanding of whether we had a solid foundation for our Microsoft Lync implementation before beginning our transition," noted David Spann, Executive Director of Technology.

  • Legacy equipment

    Aging legacy equipment was too expensive and inflexible

  • Performance verification

    Testing to verify the performance of the district-wide network

  • Move to Lync

    Move to Lync for both administrative and classroom use

  • Detailed assessment

    Lync deployment could go ahead with confidence

"Completing AudioCodes network voice readiness assessment gave our IT staff and me the confidence to move forward with our Lync deployment, knowing that our network was up to the task and that any issues that might arise were not the result of our network."

David Spann, Executive Director of Technology at Allen Independent School District

Solution

To measure and document the performance of their network, the district contracted to perform a Network Voice Readiness Assessment (NVRA), a service offered by AudioCodes Professional Services.

The service starts with a comprehensive examination of the network topology, equipment, facilities and assets. During the examination, points in the network are identified for installation of load simulators and probes, allowing modeled call traffic generation while measuring the performance of the network. To make future testing and verification much easier, AudioCodes utilizes Mediant Media Gateways and E-SBCs to act as both NVRA load generators and probes. Once the equipment was put in place, a week-long load simulation was performed, generating worst-case call traffic on the network while metrics were collected on packet loss, jitter and latency. Once the simulation was completed, a detailed NVRA report was created, showing the performance of the network over time and under various conditions.

Results

The results of the district-wide NVRA were very positive, with the network being more than capable of handling the soon-to-be-implemented Microsoft Lync services. However, the testing did uncover an unusual spike in latency and packet loss during certain hours, just after the school day was completed. After some investigation, it was discovered that the spike in packet loss and latency was the result of congestion on the network due to a pre-scheduled network backup system flooding the routers with file transfer traffic.

David Spann commented "completing AudioCodes network voice readiness assessment gave our IT staff and me the confidence to move forward with our Lync deployment, knowing that our network was up to the task and that any issues that might arise were not the result of our network."

The Allen Independent School District is well on their way to implementing Microsoft Lync 2013 district-wide, using the voice and video features to improve communications between staff members and enable distance learning between district facilities. "Initially the district plans to utilize AudioCodes Mediant Survivable Branch Appliances (SBAs) to provide survivability at each facility," said David Spann. "As the Lync implementation progresses, the district will also be consolidating the various TDM trunking facilities to SIP Trunks, to reduce costs and improving flexibility. The migration to SIP Trunks will be facilitated by upgrading the AudioCodes Mediant SBAs with E-SBC licenses, providing interoperability, and security."

お問い合わせ